Predictive Tools for Project Performance Management in the Construction Industry

  1. Cerezo, A. 1
  2. Pastor, A. 1
  3. Otero, M. 1
  4. Portela, J. M. 1
  1. 1 Universidad de Cádiz
    info

    Universidad de Cádiz

    Cádiz, España

    ROR https://ror.org/04mxxkb11

Libro:
Lecture Notes in Management and Industrial Engineering

Editorial: Springer

ISSN: 2198-0772 2198-0780

ISBN: 9783319922720 9783319922737

Año de publicación: 2018

Páginas: 3-18

Tipo: Capítulo de Libro

DOI: 10.1007/978-3-319-92273-7_1 GOOGLE SCHOLAR lock_openAcceso abierto editor

Resumen

During the 2009–2015 period, the construction industry in Spain has experienced a state of crisis that has forced companies to rethink their strategies, both for their survival in the present and the carrying out of their activities in the future.

Referencias bibliográficas

  • Alsina J (2013) Gestión de valor ganado “EVM” para control de proyectos. In: Project chapter. Available via http://www.projectcharter.com . Cited 15 Nov 2016
  • Bustos O (2014) Factores latentes de la desviación de presupuestos en proyectos de arquitectura. Universitat Politècnica de València, Un análisis empírico. http://sci-hub.tw/10.13140/RG.2.1.1214.4168
  • Camilleri E (2011) Project success: critical factors and behavoiurs. Gower Publishing Company, Burlington, NJ, USA
  • Cho CS, Gibson GE (2001) Building project scope definition using project definition rating index. J Architectural Eng 7:115–125. http://sci-hub.tw/10.1061/(ASCE)1076-0431(2001)7:4(115)
  • Chritamara S, Ogunlana SO, Bach NL (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Eng, Constr Architectural Manage 8:381–392. http://sci-hub.tw/10.1108/eb021198
  • Consejo Superior de los Colegios de Arquitectos de España -CSCAE- (2016) Estadística de la edificación: 4º trimestre 2015. In: Estadística de la edificación. Available via https://www.cscae.com/index.php/es/servicios58/estadistica/informes36 . Cited 15 Nov 2016
  • Construction Industry Institute -CII- (1999) RR155-11. Development of a project definition rating index (PDRI) for building projects. The University of Texas at Austin, Tx, USA
  • Davis K (2014) Different stakeholder groups and their perceptions of project success. Int J Project Manage 32:189–201. http://sci-hub.tw/10.1016/j.ijproman.2013.02.006
  • Dumont PR, Gibson GE, Fish J (1997) Scope management using PDRI. J Manage Eng 13:54–60. http://sci-hub.tw/10.1061/(ASCE)0742-597X(1997)13:5(54)
  • Fageha MK, Aibinu AA (2013) Managing project scope definition to improve stakeholders’ participation and enhance project outcome. Procedia – Soc Behav Sci 74:154–164. http://sci-hub.tw/10.1016/j.sbspro.2013.03.038
  • Fageha MK, Aibinu AA (2014) Prioritising Project scope definition elements in public building projects. Australas J Constr Econ Build 14:18–33. http://sci-hub.tw/10.5130/ajceb.v14i3.4155
  • Fleming QW, Koppelman JM (2010) Earned value project management, 4th edn. Project Management Institute -PMI-, Newtown Square, PA, USA
  • Fortune J, White D, Jugdev K, Walker D (2011) Looking again at current practice in project management. Int J Managing Projects Bus 4:553–572. http://sci-hub.tw/10.1108/17538371111164010
  • Heywood C, Smith J (2006) Integrating stakeholders during community FM’s early project phases. Facilities 24:300–313. http://sci-hub.tw/10.1108/02632770610666152
  • Instituto Nacional de Estadística -INE- (2016) Contabilidad nacional trimestral de España. 4º trimestre 2015. In: Sección Prensa. Available via http://www.ine.es/prensa/seccion_prensa.htm . Cited 15 Nov 2016
  • International Project Management Association -IPMA- (2015) Individual competence baseline for project, programme & portfolio management, 4th edn. International Project Management Association -IPMA-, Zurich, Switzerland
  • International Organization for Standardization -ISO- (2012) ISO21500: guidance on project management. International Organization for Standardization -ISO-, Geneva, Switzerland
  • KPMG (2015) Global construction survey 2015: Climbing the curve. In: Informes y Tendencias. Available via https://home.kpmg.com/es/es/home/tendencias/2015/04/global-construction-survey-2015.html . Cited 15 Nov 2016
  • Project Management Institute -PMI- (2013) A guide to the project management body of knowledge -PMBOK-, 5th edn. Project Management Institute -PMI-, Newtown Square, PA, USA
  • Project Management Institute -PMI- (2011) Practice standard for earned value management, 2nd edn. Project Management Institute -PMI-, Newtown Square, PA, USA
  • Shenhar AJ, Dvir D, Levy O, Maltz AC (2001) Project success: a multidimensional strategic concept. Long Range Plan 34:699–725. http://sci-hub.tw/10.1016/S0024-6301(01)00097-8
  • Subdirección General de Estudios Económicos y Estadísticas -SGEEE- (2016) Estructura de la construcción 2014. In: Publicaciones Anuales. Available via http://www.fomento.es/NR/rdonlyres/1F17450D-9AE2-43D6-9C1B-EBA02F9413A7/136574/EC2014.pdf . Cited 15 Nov 2016
  • Tello E (2010) Valor ganado, una operativa a seguir para monitorear un proyecto. In: Proceedings of the Congress Tour PMI Cono Sur 2010. PMI-Buenos Aires Chapter, Mendoza, Argentina
  • Valderrama FG, Guadalupe RE (2010) Dos modelos de aplicación del método EVM para el sector de la construcción. In: Proceedings of the 14th international congress on project engineering. Asociación Española de Dirección e Ingeniería de Proyectos -AEIPRO-, Madrid, Spain
  • Wang Y (2002) Applying the PDRI in project risk management. The University of Texas at Austin, Tx, USA